Practical investment guides

Read the project behind the headline.

A capacity figure or stage label is a starting point. These short guides explain the distinctions that matter when comparing energy projects and data-center sites.

01

Project stage and availability answer different questions

Stage describes development progress. Availability describes whether a transaction is currently possible. An advanced project may still have outstanding conditions, while an early-stage project may offer a defined development partnership.

02

MW, MWh, MVA and IT load are different measures

Compare like with like. Battery power and energy, grid connection ratings and data-center IT capacity describe different parts of an asset. Adding them together can create a misleading impression of scale or readiness.

03

For data centers, establish the path to usable power

A nearby substation, a connection target and an energized supply are materially different propositions. Review the evidence for each stage of delivery and keep current supply separate from expansion plans.

04

Treat portfolio totals as a defined view

Portfolio totals may combine projects at different stages and include quantified options. Read the methodology alongside the headline, and use project documents to assess individual opportunities.

October 2026 portfolio snapshot

Renewables and storage by listing group (MW)
Listing groupSolar PVBESSWindPumped hydroTotal
Operating / EPC / RTB / late-stage1,81773527802,830
Pre-RTB2,660.64,3081,76808,736.6
Greenfield / co-development917.7401.41,0041502,473.1
Total5,395.35,444.43,05015014,039.7

Source: Bura Energy portfolio overview, 23 October 2026. 63 energy listings across 16 countries. These are listed capacities, including quantified options and development targets. Ranges use the lower bound. PV units follow the source and are not normalized between MWp and MWac.

732 MWh of BESS is excluded from MW totals where power is unspecified. Sub-projects already included in a parent portfolio are not added again. Publicly displayed opportunities are a selected subset and do not reproduce every listing in the full portfolio.

Data centers are reported separately

14 site listings, plus the modular BESS + compute offering. The overview reports approximately 1.07 GW of site power / targets, with 200 MVA and 100 MW of IT targets shown separately. These categories are not added together. Backup supplies and expansion options are excluded from the principal site-power total. Figures do not imply that power is secured, energized or immediately available.

Geographic coverage spans 18 countries across the combined portfolio. Region shares refer to energy capacity only: CEE & Baltics 54.5%, Adriatic & SEE 35.2%, Southern Europe 7.5%, Central Asia 2.8%.